Showing posts with label United Arab Emirates. Show all posts
Showing posts with label United Arab Emirates. Show all posts

Wednesday, 12 February 2014

Holistic Approach - Markus Giebel







Business Planning and Development

  • Market Research
  • Opportunity Identification
  • Feasibility Analysis
  • Highest-and-best-use Analysis
  • USP Definition
  • Land Acquisition
  • Legal Due Diligence/ Review and Drafting of Contracts

Product Concept and Development


  • Detailed Product Definition
  • Project Program
  • Design Management: Master Planning,
  • Architecture, Engineering, Infrastructure
  • Coordination of Specialty Consultants
  • Value-Engineering
  • Permit Strategy and Procurement

Wednesday, 22 January 2014

Markus Giebel - Automated Water Leakage Detection

Installation of an Automated Leak Detection System

The Feasibility and Benefits of Automated Water Leakage detection, repair and maintenance











13,000 Noise Loggers
2,600 Flow Meters
Transmission Monitoring Systems
4,400 Repeaters
267 Data Collectors and
30 Leakage Inspectors (staff)
Estimated Cost: AED 106 million



Read more: soliton water markus giebel

Monday, 23 December 2013

Markus Giebel & Michael Schumacher

The Michael Schumacher World Champion Tower (MSWCT) launched at CityScape Abu Dhabi 2008

The Michael Schumacher World Champion Tower (MSWCT) will be located in a spectacular setting in the Central Business District of Reem Island, Abu Dhabi, capital of the United Arab Emirates. The wharf tower will emerge from the sea, integrated beautifully with the water on the seafront and comprise a luxury marina.
Developed by Marasi and PNYG, the Michael Schumacher tower will be an inspirational architectural landmark, epitomising the same fusion of high technology and human tenacity that powered Michael Schumacher to his sporting achievements.